Expo 2020

ENOC marks ground-breaking of its Expo 2020 Dubai pavilion under the theme ‘Reimagine Energy’
Set to be completed by July 2020, ENOC’s innovative pavilion is built by UAE-based contractors using sustainable construction methods
Powering the future
Electricity and water are the main challenges of fast growing economy such as Dubai. With the emirate’s population projected to double by 2030, Dubai Electricity and Water Authority (DEWA) is leaving nothing to chance. From the largest solar park in the world, to the first ever coal power plant in the Gulf, DEWA is fully charged to power up the future of Dubai. Writes Baset Asaba
UPS London switches on smart grid to charge EV fleet
The breakthrough signals the beginning of the end of a reliance upon traditional combustion engine powered vehicles by allowing UPS to increase the number of EVs operating from its central London site from the current limit of 65 to 170
DEWA backs Expo 2020 with huge investments
Utility allocates AED 2.6bn ($700mn) to boost infrastructure ahead of prestigious event.
Powering Expo 2020
Dubai needs and additional 250,000Mwh for EXPO 2020
The Expo Challenge
Dubai needs an additional 250,000MWh for Expo 2020

Most Popular